Rain Lag

The Analog Incident Story Trolley: Rolling a Paper Reliability Tour Through Your Office Hallways

How a low-tech ‘incident story trolley’—filled with printed playbooks, Kanban boards, and real-world post-mortems—can transform your team’s reliability mindset and sharpen your incident response under pressure.

The Analog Incident Story Trolley: Rolling a Paper Reliability Tour Through Your Office Hallways

If your team only thinks about incidents when PagerDuty screams, you’re already behind.

Most organizations treat reliability as something that lives in dashboards, chat alerts, and ticket queues. But what if you pulled those invisible systems into the hallway—literally—and made them impossible to ignore?

Enter the Analog Incident Story Trolley: a rolling, low-tech, paper-based tour of your system’s reliability story. It’s a physical cart (or whiteboard on wheels) that moves around your office, stopping at teams and spaces like a traveling reliability roadshow.

On it? Printed incident playbooks, Kanban boards, post-mortems, and “blockers” lists—everything you need to make reliability visible, tangible, and shared.

This isn’t nostalgia for paper. It’s about attention and behavior. You can ignore a wiki page. It’s harder to ignore a cart parked next to your desk with a giant “WHAT COULD BREAK TODAY?” poster on it.

Let’s walk through how to build and use an Analog Incident Story Trolley that actually improves your incident response and reliability culture.


Why Go Analog for Incidents?

Three reasons this surprisingly effective, low-tech idea works:

  1. Visibility – Digital systems hide complexity. A cart full of printed artifacts surfaces what’s fragile, unfinished, or unclear.
  2. Focus under pressure – In a real incident, people don’t need more tools; they need clear steps. Having playbooks and flows you’ve walked through physically helps them become muscle memory.
  3. Shared understanding – Reliability is cross-functional. A physical trolley invites conversation: engineers, PMs, support, and leadership can stand around it and literally point at the same piece of paper.

Step 1: Stock the Trolley With Real Incident Playbooks

The heart of your trolley is a comprehensive, documented incident response playbook—printed, tabbed, and easy to flip through.

Each playbook should cover four core stages:

  1. Detection

    • How do we know something is wrong?
    • What alerts, metrics, or customer signals matter most?
    • Who is paged, and via what system?
  2. Diagnosis

    • What are the first questions to ask?
    • What dashboards or logs do we open first?
    • What are the top 3-5 likely failure modes for this service?
  3. Resolution

    • What are safe, documented mitigation steps?
    • What temporary and long-term fixes exist?
    • How do we know it’s safe to close the incident?
  4. Post-mortem

    • Who leads the review?
    • What template do we use?
    • How do we ensure follow-up actions are created and tracked?

Make it standardized. Use the same structure and language across services so anyone can pick up any playbook and feel oriented. In a high-stress incident, familiarity is a superpower.

On the trolley, organize playbooks with:

  • Service tabs: “Payments”, “Login”, “Notifications”, etc.
  • Incident types: “Latency”, “Outage”, “Degradation”, “Data Integrity”.
  • Cheat sheets: One-page “When PagerDuty goes off, do this” flowcharts.

The goal: when the pressure is on, no one is guessing the next step—they’re following a calm, documented path.


Step 2: Standardize Procedures to Reduce Panic

Under pressure, teams don’t rise to the occasion—they fall to the level of their preparation.

Your Analog Incident Story Trolley should embody standardized procedures for how incidents are handled, regardless of who’s on call.

Print and display:

  • Incident roles: Incident Commander, Communications Lead, Tech Lead, Scribe—what each is responsible for.
  • Severity levels: Clear definitions of Sev0/Sev1/Sev2, with examples and response expectations.
  • Response checklist: Time-stamped steps like:
    • 0–5 min: Acknowledge alert, assign roles
    • 5–15 min: Establish incident channel, initial status update
    • 15–30 min: Stabilize, define mitigation, update stakeholders
    • 30+ min: Continue work, scheduled updates

Standardization does three things:

  1. Keeps everyone calm – Familiar steps reduce cognitive load when adrenaline is high.
  2. Improves consistency – Two different teams handle a Sev1 the same way.
  3. Shortens onboarding – New engineers have a concrete reference, not just tribal lore.

Use the trolley to walk teams through these procedures in person—like a mini fire drill, but for systems.


Step 3: Make Communication Rituals Tangible

Most reliability issues don’t start as headline incidents. They start as:

  • A weird log nobody has time to investigate
  • A recurring timeout “that usually resolves itself”
  • A support ticket pattern no one connects to a systemic problem

You need regular communication rituals that surface these early signals before they explode.

On your trolley, visibly document your rituals:

  • Daily standups – Include a standard question: “Any reliability or incident risks today?”
  • Weekly 1:1s – Add a prompt: “Anything you’re worried might break soon?”
  • Bi-weekly reviews – Dedicated segment for “reliability and incident trends”: top recurring alerts, top slow-burning risks.

Post these prompts as posters or cards on the trolley to normalize the idea that risk talk is regular, expected, and safe.

Then, use the trolley as a prop:

  • Roll it to team areas during standup weeks focused on reliability.
  • Run a “Reliability Week” where every team adds at least one risk or near-miss to the board.

The analog presence acts as a reminder: reliability isn’t just an ops problem; it’s a team habit.


Step 4: Create a Shared “Blockers & Risks” Corner

Before incidents come blockers and frictions—things that slow teams down or hint at deeper instability.

Dedicate part of the trolley to a shared blockers and risk channel, represented physically.

Ideas:

  • A “Blockers” board with sticky notes for:
    • “Waiting on logs access to debug X”
    • “Load tests still not automated for Y”
    • “Single point of failure in Z; no backup plan”
  • A “Near Misses” section:
    • “We almost pushed broken config to prod, caught at last minute”
    • “Customer found a bug before we did”

Digitally, this corresponds to a Slack/Teams channel (e.g., #blockers-and-risks), but the trolley:

  • Makes it visible to leadership walking by.
  • Encourages conversations like, “Why is this still here after 3 weeks?”
  • Normalizes raising issues early instead of hiding them.

Over time, this corner becomes your early warning radar—a place to catch problems long before they become incidents.


Step 5: Visualize Work With a Reliability Kanban Board

Incidents spawn work: fixes, refactors, monitoring improvements, documentation updates. Without a clear system, they vanish into backlog purgatory.

Mount a Kanban board on the trolley to track all reliability- and incident-related work. At minimum, include columns like:

  • Backlog – Known reliability tasks, post-mortem actions, tech debt that affects stability.
  • Ready – Prioritized and well-defined tasks.
  • In Progress – Work currently being done.
  • Review – Work awaiting code review, testing, or validation.
  • Done – Completed tasks (keep them visible for a while to show progress).

This does two things:

  1. Makes scope manageable – You can see when you’re overloaded and need to say no to more work.
  2. Surfaces priorities – It’s obvious which critical reliability work isn’t being touched.

Use the Kanban board to limit WIP (work in progress) and to ensure the most critical reliability tasks are actually the ones being worked on.


Step 6: Upgrade to an Advanced Multi-Project Kanban

As you mature, your reliability work will span multiple services, teams, and phases of incident response.

Evolve the trolley’s Kanban into an advanced board that:

  • Represents multiple projects (e.g., “Payments Resilience”, “Login Hardening”, “On-call Improvements”).
  • Breaks work into specific process steps, such as:
    • Discovery → Design → Implementation → Test → Rollout → Verification.
  • Uses swimlanes for:
    • Preventive reliability work (e.g., chaos testing, capacity planning).
    • Reactive work (incident follow-ups, hotfixes).
    • Process improvements (better runbooks, improved alerting, training).

Label each card with:

  • Owner (who’s accountable)
  • Incident link or post-mortem ID (if applicable)
  • Priority and expected impact on reliability

During incident simulations or reviews, you can stand around the trolley and literally trace:

  • How an incident turned into action items.
  • Where those items currently sit in the flow.
  • Who’s responsible for what.

The advanced Kanban transforms your trolley from a curiosity into a reliability command center on wheels.


Step 7: Use the Trolley as a Storytelling Engine

The real power of the Analog Incident Story Trolley isn’t just process—it’s story.

Print and display:

  • Selected post-mortems: Highlight not the failure, but the learning and follow-up actions.
  • Before/after snapshots: Incident frequency or MTTR before a change vs after.
  • Quotes from engineers and customers: Human reactions to outages—and recoveries.

Use these stories to:

  • Onboard new team members into your reliability history.
  • Remind leadership what investments have already paid off.
  • Reinforce the idea that incidents are teachers, not only disasters.

By rolling these stories through your hallways, you build a shared narrative:

“We take incidents seriously. We learn. We improve. And everyone can see how.”


Conclusion: Turning Paper Into Practice

The Analog Incident Story Trolley is intentionally simple: a cart, some printouts, a Kanban board, and a commitment to bring reliability conversations into the open.

But behind the paper is a powerful pattern:

  • Documented playbooks guide detection, diagnosis, resolution, and post-mortems.
  • Standard procedures create calm, consistent response under pressure.
  • Communication rituals surface reliability risks early and often.
  • Shared blockers channels catch issues before they explode into incidents.
  • Kanban visualization ensures the most important reliability work is prioritized and finished.
  • Advanced boards clarify ownership and flow across multiple projects and phases.

You don’t need a massive new tool to improve incident response. You need shared visibility, clear process, and regular, honest conversations about risk.

Sometimes, the best way to fix digital problems is to start with something you can literally roll down the hallway.

So find a cart. Print your playbooks. Draw your Kanban. And let your Analog Incident Story Trolley start telling the reliability story your organization needs to hear.

The Analog Incident Story Trolley: Rolling a Paper Reliability Tour Through Your Office Hallways | Rain Lag