Rain Lag

The Paper-First Incident Garden Railway: Growing Reliability Rituals Along a Handmade Track

How a paper-first ‘garden railway’ metaphor can transform incident tabletop exercises into a living, low-cost reliability practice that grows stronger over time.

The Paper-First Incident Garden Railway: Growing Reliability Rituals Along a Handmade Track

Reliability isn’t built in a conference room slide deck.

It’s grown.

Like a garden. Like a handmade model railway, tested and tuned on a kitchen table before it ever sees a backyard.

In this post, we’ll explore how paper-first incident tabletop exercises can become your team’s “incident garden railway” — a simple, low-cost way to design, test, and refine your reliability rituals long before you’re under real production pressure.

We’ll walk through what tabletop exercises are, how to run them, and how thinking like a gardener (not an architect) changes everything about how your organization approaches reliability.


From Grand Blueprints to Paper Tracks

Many organizations start their incident response programs like they’re designing a high-speed bullet train:

  • Big plans
  • Heavy documentation
  • Complex tools and automations
  • Long meetings to define roles and responsibilities

But when the first major outage hits, all that careful architecture meets reality:

  • Who’s actually in charge right now?
  • Who’s talking to customers?
  • What channel are we using?
  • Who’s allowed to restart this system?

The plans look good on paper, but they’ve never been lived in.

A better approach is to start small and tactile — like building a paper-first garden railway on your table:

  • No code.
  • No automation.
  • No pager integration.

Just people, a scenario, time pressure, and your current incident process printed out in front of you.

That’s exactly what incident tabletop exercises provide.


What Is a Tabletop Exercise (and Why It’s So Cheap and Powerful)

An incident tabletop exercise is a low-cost, low-stakes simulation where a group walks through how they’d respond to a hypothetical emergency or failure scenario.

Think of it as:

A role-play of your next big incident — before it actually happens.

Key characteristics:

  • Low-cost: You need only a facilitator, participants, a scenario, and 30–60 minutes.
  • Low-stakes: No real systems are touched. Mistakes are learning opportunities, not career risks.
  • Time-bounded: Often ~30 minutes of focused simulation plus 15–30 minutes of debrief.
  • Paper-first: It’s about plans, decisions, and communication — not tools or dashboards.

Why it matters:

  • You get to evaluate the effectiveness of your current incident response and reliability plans.
  • You reveal gaps in communication, coordination, and decision-making before a real outage.
  • You create shared muscle memory so that when real alarms fire, people aren’t improvising from scratch.

In other words, tabletops are how you lay down your first tracks — lightly, reversibly, and cheaply.


Treating Incidents Like a Garden (Not a Fire)

Most teams treat incidents like house fires:

  • We wait until something is burning.
  • We scramble in chaos.
  • We promise, “This will never happen again.”
  • We write a big postmortem.

Then we move on — until the next fire.

But reliability improves through continuous, iterative practice, not one-time heroics or planning. That’s why the metaphor of an incident garden is so useful:

  • You don’t plant once and declare victory.
  • You weed, water, prune, and replant.
  • You notice what thrives in your particular environment.
  • You accept that you’ll never be “done,” only more resilient.

Tabletop exercises are your gardening sessions. Each one is a chance to:

  • Pull out communication weeds.
  • Add new support structures (runbooks, checklists, automations).
  • Test whether your current environment (on-call rotations, tools, org structure) actually supports growth.

And when you add the railway metaphor, it gets even clearer: over time, you’re not just planting; you’re slowly laying down a reliable track that incidents can travel along in a predictable, practiced way.


Building Your Paper-First Incident Railway

Let’s make this concrete. Here’s how to set up a simple, repeatable tabletop practice.

1. Define a Simple Scenario

Start with a realistic but not catastrophic situation. For example:

  • “Our primary database becomes read-only during peak traffic.”
  • “Our payment provider starts returning intermittent errors.”
  • “A critical internal service fails in one region.”

Your scenario should include:

  • Trigger: What’s the first thing someone would see? (Pager alert, Slack message, customer report, dashboard red.)
  • Symptoms over time: How does the situation evolve at 5, 15, 30 minutes?
  • Uncertainty: Provide clues, not answers. The point is the process, not the puzzle.

2. Gather the Right People

For a small tabletop (30–45 minutes), you typically want:

  • 1 facilitator (who presents the scenario and keeps time)
  • 4–8 participants, ideally including:
    • On-call engineer or SRE
    • Team lead or engineering manager
    • Representative from support / customer success
    • Possibly product or incident commander role

The mix matters. You’re testing how people coordinate, not just how individuals debug.

3. Set the Ground Rules

Before you start, make expectations clear:

  • This is a safe space to make mistakes.
  • We’re practicing communication and decision-making, not just technical fixes.
  • Time is compressed. When the facilitator says “It’s now 20 minutes into the incident,” everyone plays along.

Then, put your tools on the table:

  • Your incident response runbook or checklist
  • Your communication channels (Slack, email, status page policies)
  • Any standard roles you use (incident commander, scribe, tech lead, liaison)

4. “Act Out” the Incident

The facilitator now walks everyone through the scenario. The team responds as if it were real:

  • How is the incident declared?
  • Who is the incident commander?
  • Where do you coordinate (Slack channel? Zoom call?)
  • When do you escalate? To whom?
  • When and how do you communicate externally?

The facilitator introduces new information over time:

  • “Five minutes in, your error rate doubles.”
  • “Support reports three major customers are affected.”
  • “An executive pings asking for an ETA.”

Participants talk through what they would do, step by step. They consult runbooks, make decisions, and narrate their actions.

You’re walking a paper train along a paper track, seeing where it derails.

5. Repeat with a Twist

A single run is helpful, but the real insights come when you re-run the same scenario with one or more variables changed:

  • The incident commander is a different person.
  • The primary on-call is a new hire.
  • The incident occurs outside business hours.
  • Your main communication tool (e.g., Slack) is unavailable.

Repeating the same scenario reveals:

  • Hidden dependencies on specific people.
  • Fragile assumptions about tools or timing.
  • How adaptable your process really is.

Every rerun is another lap of the train around the garden. Weaknesses stop being theoretical and become obvious friction you can feel.


What You’ll Learn (That No Document Will Tell You)

When you run tabletop exercises regularly, you start to see patterns:

  • Communication gaps

    • People don’t know which channel to use.
    • Stakeholders are left in the dark.
    • Status updates are inconsistent or missing.
  • Coordination issues

    • Two people assume they’re both incident commander — or nobody is.
    • Support doesn’t know when it’s okay to update customers.
    • Engineers debug silently instead of narrating.
  • Decision-making problems

    • Nobody knows who can approve a rollback.
    • Trade-offs (availability vs. data consistency vs. customer impact) are unclear.
    • Escalations are delayed because “it might fix itself.”

These issues are cheap to fix on paper and extremely expensive to encounter for the first time in production.

Your tabletop debrief becomes your gardening notebook:

  • "We need a simple incident role card."
  • "We should define a default Slack channel naming convention."
  • "We need a one-page guide for when and how to update the status page."

Over time, this notebook turns into a small, well-tended ecosystem of rituals and tools that make your real incidents calmer and more predictable.


Rituals: The Secret Track Under the Garden

Tools matter, but when things go wrong, rituals matter more.

Tabletop exercises help you standardize simple, powerful incident rituals, such as:

  • Declare early: Name the incident, create a channel, assign roles.
  • Time-bounded updates: Every 10–15 minutes, update what’s known, unknown, and next.
  • Single source of truth: Keep a live log or doc where all key decisions are recorded.
  • Protect focus: One person coordinates; others minimize noise.
  • Post-incident reflection: Short, structured debrief focusing on learning, not blame.

These rituals are the track your incident train follows. They keep you from improvising everything from scratch while stressed.

And because you grow them through repeated, small, paper-first practice, they feel natural instead of forced.


Conclusion: Start with Paper, Grow a Railway

You don’t need a perfect incident response system. You need one that is practiced.

By treating incidents like a garden — something you cultivate, revisit, and slowly improve — and using paper-first tabletop exercises as your garden railway, you:

  • Turn abstract incident plans into lived experience.
  • Expose communication and coordination gaps when they’re still cheap to fix.
  • Build shared rituals that make real incidents calmer and more effective.

You can start this week with:

  1. A single 30-minute scenario.
  2. A handful of people.
  3. A facilitator and a timer.

Lay down a short piece of paper track.

Then another.

Over time, you’ll look back and realize you didn’t just grow a set of documents — you grew a resilient, practiced, reliable incident response culture that knows exactly how to keep the trains running, even when the weather turns.

The Paper-First Incident Garden Railway: Growing Reliability Rituals Along a Handmade Track | Rain Lag